Friday, June 15, 2012

Two 600 BHP Steam Generator installation

Two 600 BHP Steam Generator installation Tube. Duration : 1.32 Mins.


The video shows two 600 BHP Clayton Steam Generators being installed in concrete block manufacturing facility. Additionally a pressurized deaerator was installed to provide feedwater to the boilers.

Keywords: 600, BHP, Steam, Generator, installation, Clayton, Industries, Feedwater, Pump, Heat, Exchanger, Separator, Coiltube, Boiler, Condensing, Economizers, Enhanced, Oil, Recovery, Exhaust, Gas, E-Series, HRSG, Industrial, Low, nox, Offshore, Marine, Packaged, PLC, Control, Systems, Superheat, Watertube, Manufacturer, Water, Treatment, Chemicals, Global, Manufacturing

No comments:

Post a Comment