This video shows two 250 BHP Clayton steam generators installed in an industrial application. These fully automatic unmanned units produce 8 T/h of high quality dry steam and are sequencely controlled to maintain system pressure. They can be started and brought up to full pressure within 5 minutes from a cold start. The steam generators are inherently safe from steam explosions due to their coil tube design.
Keywords: 250, BHP, Clayton, Industries, Feedwater, Pump, Heat, Exchanger, Steam, Separator, Coiltube, Boiler, Condensing, Economizers, Enhanced, Oil, Recovery, Exhaust, Gas, E-Series, Generator, HRSG, Industrial, Low, nox, Offshore, Marine, Packaged, PLC, Control, Systems, Superheat, Watertube, Manufacturer, Water, Treatment, Chemicals, Global, Manufacturing
No comments:
Post a Comment