Clayton Safety Demonstration

Clayton Safety Demonstration Video Clips. Duration : 3.92 Mins.


To demonstrate the inherent safety of the Clayton Steam Generator design, a test was conducted at our plant for a Canadian agency. Even with the safety devices removed, this test proved that it is not possible to create a steam explosion with the Clayton mono-tube, forced flow design.

Keywords: Clayton, Industries, Feedwater, Pump, Heat, Exchanger, Steam, Separator, Coiltube, Boiler, Condensing, Economizers, Enhanced, Oil, Recovery, Exhaust, Gas, E-Series, Generator, HRSG, Industrial, Low, nox, Offshore, Marine, Packaged, PLC, Control, Systems, Superheat, Watertube, Manufacturer, Water, Treatment, Chemicals, Global, Manufacturing

Thursday, July 12, 2012

Clayton Exhaust Gas Boilers

Clayton Exhaust Gas Boilers Tube. Duration : 1.67 Mins.


This video shows an installation with four Clayton Exhaust gas steam generators with by-pass controls on multiple gas engine generator sets. Clayton also supplied the complete feedwater treatment systems for this installation. The units recover 5 MW of heat and produce over 7 T/h of high quality steam. The system is controlled through a centrally located touch screen control panel provided by Clayton.

Tags: Clayton, Industries, Feedwater, Pump, Heat, Exchanger, Steam, Separator, Coiltube, Boiler, Condensing, Economizers, Enhanced, Oil, Recovery, Exhaust, Gas, E-Series, Generator, HRSG, Industrial, Low, nox, Offshore, Marine, Packaged, PLC, Control, Systems, Superheat, Watertube, Manufacturer, Water, Treatment, Chemicals, Global, Manufacturing

Saturday, June 23, 2012

Clayton SH Steam Generator in Power Plant

Clayton SH Steam Generator in Power Plant Video Clips. Duration : 2.77 Mins.


This video shows the installation of a Clayton Superheat Steam Generator at a Power Plant in Wales UK. The modular unit is assembled on site and then lowered through a roof to a location inside the plant. It demonstrates to ease of installation provided by Clayton compact coil tube design. Able to start-up and come to full superheated steam operation in less than 20 minutes, this steam generator greatly enhances the power plant's response time.

Tags: Clayton, SH, power, plant, Industries, Feedwater, Pump, Heat, Exchanger, Steam, Separator, Coiltube, Boiler, Condensing, Economizers, Enhanced, Oil, Recovery, Exhaust, Gas, E-Series, Generator, HRSG, Industrial, Low, nox, Offshore, Marine, Packaged, PLC, Control, Systems, Superheat, Watertube, Manufacturer, Water, Treatment, Chemicals, Global, Manufacturing

Friday, June 22, 2012

Two Clayton 250 BHP Steam Generators

Two Clayton 250 BHP Steam Generators Video Clips. Duration : 1.45 Mins.


This video shows two 250 BHP Clayton steam generators installed in an industrial application. These fully automatic unmanned units produce 8 T/h of high quality dry steam and are sequencely controlled to maintain system pressure. They can be started and brought up to full pressure within 5 minutes from a cold start. The steam generators are inherently safe from steam explosions due to their coil tube design.

Keywords: 250, BHP, Clayton, Industries, Feedwater, Pump, Heat, Exchanger, Steam, Separator, Coiltube, Boiler, Condensing, Economizers, Enhanced, Oil, Recovery, Exhaust, Gas, E-Series, Generator, HRSG, Industrial, Low, nox, Offshore, Marine, Packaged, PLC, Control, Systems, Superheat, Watertube, Manufacturer, Water, Treatment, Chemicals, Global, Manufacturing