Showing posts with label setting. Show all posts
Showing posts with label setting. Show all posts

Sunday, August 12, 2012

HRSG module setting (11A bundle) at Deer Creek Station

HRSG module setting (11A bundle) at Deer Creek Station Tube. Duration : 8.95 Mins.


First lift of a HRSG module at Deer Creek Station, a combined-cycle power plant under construction in Brookings County, SD. www.basinelectric.com http

Tags: HRSG, module, setting, (11A, bundle), at, Deer, Creek, Station, Basin, Electric, Power, Cooperative, BEPC, Bismarck, ND, North, Dakota, Elkton, SD, South, combined, cycle, plant, natural, gas, heat, recovery, steam, generator